Consultant at K24 Staffing
Views:164 Applications:5 Rec. Actions:Recruiter Actions:0
Engineer/Manager - Mechanical Design - Water & Waste Water Projects/Epc Firm (7-15 yrs)
Detail Engineering :
1. Preparation of Equipment layout and civil outline drawings for Water & Waste water projects.
2. Preparation of Piping Material specification and valve material specification as per project.
3. Cross checking of hydraulic calculation and hydraulic flow diagram during detail engineering.
4. Preparation of pump head calculation and blower head calculation.
5. Preparation of RFQ (ready for quotations) for Bought out items such as pumps, valves, Cranes..etc
6. Preparation of RFQ for Package items such as compressor, Ferric dosing, Alkaline dosing etc.
- Preparation of technical datasheets for all rotary and static equipment's.
7. Preparation of technical bid evaluation and manufacturing clearance for all the bought out
8. Checking of vendor GA's for various equipment's.
9. Follow up with vendor & consultant/client for the documents approval.
10. Preparation of line sizing and pipe wall thickness calculation.
11. Design and preparation of fabrication skid drawings such as UF Module rack, valve rack and compact High pressure RO Skids, RO CIP Skids and UF Backwash skids
12. Checking of piping isometric drawings and piping 2D GA drawing.
13. Checking of pipe supports drawings (Above ground and below grounds such as thrust block)
14. Preparation and checking of mechanical GA drawings as per the bought out details.
15. Preparation of initial and final piping MTO (Material to be ordered).
16. Preparation of erection BOM and release for site.
17. Coordination of other disciplines such as Process, Civil, Electrical and instrumentation.
18. Co-ordination of site team and preparation of as built drawings.
19. To understand the design risk and assumptions associated with the project and manage this risk.
20. To record the risks and assumptions as the project progresses.
21. Undertake post project reviews to identify and communicate lessons learnt and best practice.
22. Ensure the design team are working to the company procedures (i.e. Engineering, CAD, and QA procedures).
23. Identify potential improvements to the client's systems and procedures
24. knowledge of the design process, engineering, and engineering design
25. Good understanding of project commercial issues and constraints
Software Requirements :
1 Experience in either of AutoCAD- P&ID, Open Plant PID, Smart Plant P&ID, Open Plant Modeller is desired
2 Revit MEP, Navis works
3 Microsoft Word, Excel, and PDF document management,
4 Design experience of water supply/WTP projects will be considered.
Should have knowledge on SCADA for WPT process. / Working knowledge of AutoCAD
This job opening was posted long time back. It may not be active. Nor was it removed by the recruiter. Please use your discretion.