MEP QS/Cost & Estimation Professional - Pre Contracts (5-15 yrs)
- BOQ and Design validation of the requirement.
- Quantity takes off from AutoCAD drawings.
- Should have knowledge of Electrical load calculations like transformer sizing, cable sizing, panel sizing, UPS battery sizing calculation, PDU sizing etc.
- Scrutiny of SLD, BOQ, Specification, Technical data sheets, Makes.
- Cost Estimation & Rate analysis of Electrical High side and Low side, Substation HT Line & associated accessories etc.
- Preparation of variations of orders.
- Rate analysis of NT items for the amendment of orders.
- Negotiation with vendors for Techno- commercial offer submitted by them.
- Should have knowledge of the relevant IS codes of the BOQ line items.
- Should have knowledge of Substation equipment, HT & LT connection line along with associated accessories.
- Should have worked on base build and fit out projects
- Should have knowledge of the documents related to contract agreement.
- Should have worked on Value engineering and Design Optimization.