Recruiter Logo
Now Apply on the Go!
Download engineeristic Jobseeker App and get a seamless experience for your job-hunting
19/06 Sneha Shetty
Recruitment Consultant at Bask HR Consulting Pvt Ltd

Views:537 Applications:48 Rec. Actions:Recruiter Actions:17

Technical Expert - Charging Infrastructure - Electrical Vehicle (6-15 yrs)

Jaipur/Rajasthan Job Code: 23748

Job Purpose : Create specifications, design, development, and validation of charging infra and ensure overall technical aspects for charging station readiness. Interface between internal and external touchpoints for technical CI (R&D, SS&SC, manufacturing, suppliers, and vendors) to drive the development of the charging infrastructure.

Key Accountabilities and Applied Activities:

1. Develop technical specs for tower/ charger and stations

- Identify & develop the technical specs of charger/tower basis business strategies, Develop SORs, and component level technical requirements for the towers and stations.

- Identify and develop the E&E architecture and implications on the charger/ tower basis battery BMS and cloud platform requirement.

- Work on the design and prototype of the charger/ tower/ station. Components of E&E architecture requirements. Power components functional & thermal management performance.

- Work with colleagues in R&D, SS&SC to identify and develop the right modules for swapping/ charging infra.

- Provide the technical solution in the area of design and development of the existing and new product development systems engineering.

2. Charger/ tower - Product readiness :

- Define the process - supplier qualification, validation, & checklist. Evaluate and Audit the value chain partners.

- Identify and develop the right value chain partners to be able to design, develop and test the charger/ tower/ stations meeting the business requirements.

- Supplier management

- Test plan creation, execution, and defect tracking ownership

3. Integration of tower/ charger with the CMS and battery BM :

- Hardware integration of the batteries with the towers and to the cloud.

- Similarly, for the FCS, chargers integration with the cloud.

4. Stations layout and architecture :

- Define detailed requirements of EV systems, subsystems, and components.

- Responsible for the overall station integration with the chargers/ towers at the site.

This job opening was posted long time back. It may not be active. Nor was it removed by the recruiter. Please use your discretion.

Add a note
Something suspicious? Report this job posting.